Our Planning Diary
The first day of filming would be to capture the majority of the shots, whatever we could get on that day depending if the weather is the correct type of background/location. The second lot of filming would be to get any shots we didn't get or to re film shots. Once putting together the pieces we could arrange a third lot of filming if needed to get extra shots or to change them.
Shooting schedule -
First day -
Date : 03/10/17
Duration : length needed
We will get the long shots
The main close ups of the lip syncing
Needed for filming will be the main artiste, who will be lip syncing
Also will need the weather as planned
The costumes will be the outfit discussed
Second day -
Date : 10/10/17
Duration : 2 hours
Any needed shots missed out
Any changes/re films
Same outfit as first shootings
Same weather, if not available change the shots
Third day -
Date : 25/10/17
Duration : 1 hour
If needed for more shooting
New shots
Last bits to film
Same outfit as the other shootings
Same weather ideally
This is the plan that will be followed for those days to create our final piece/music video. We will stick to the notes made as much as we can however anything that can't be helped and has to be changed or rearranged we will jot down and keep note of.
We need to keep all three days of our filming similar weather costumes and also atmosphere within the setting and location so that there is no pieces out of place.
Also if anything needs to be added to each schedule day or we need extra time or days added we can add on more days or more hours. However most footage should be shot within the first or second shooting the third should be back up should we need it.